Testing on the complete rail vehicle

«      Measurement of wheel loads of complete rolling stock without prior dismantling of the bogies

«      Measurement of wheel loads of complete rolling stock without prior dismantling of the bogies

«      Testing in accordance with the international standard DIN EN 14363 and corresponding protocol

«      Measuring wheel loads under simulation of curves and uneven tracks

«      Initial inspection of the complete rolling stock after overhaul 

«      Maintenance only if necessary! f the wheel loads are correct, systematic inspection can be avoided. The timing of any upcoming maintenance can be predicted and planned based on the measured values.

Simulation of curves and uneven tracks

NWW freigestellt

download pdf integrated bogie workshop

Integrated Bogie Workshop (.pdf)

integrated bogie workshop

Integrated Bogie Workshop